A repeat housing permit is a permit application for a new building where a previously approved Certified Model is being constructed.

Examples of repeat permits: single detached dwelling, semi-detached dwelling, detached garage, semi-detached garages.

Required Forms

Required Documentation

  • Approval Documents required by Applicable Law

Required Drawings

  • Site plan
    • Zoning Summary (permitted / proposed)
    • Property lines referenced to a current survey
    • Location of all proposed & existing buildings
    • Overall dimensions of all buildings (width / length)
    • Proposed finished first floor & basement elevations)
    • Stamped by a grading engineer, confirming that it complies with the approved grading plan for the subdivision